Holly Woods Storage

Premium commercial storage and rental units designed with elegance and functionality.

Holly Woods Storage Facility

Buildings 1 & 2

Approximately 1437 sq. ft.

Buildings 3 & 4

Approximately 1465 sq. ft.

Features Across All Buildings

Climate-controlled with A/C units
Individual 150 amp electrical panels
LED high bay lighting throughout
Half bath and slop sink in each unit
Center floor drain in each unit
Two-tone exterior: light gray and charcoal
Holly Woods Storage Exterior

Construction Features

Quality materials for durability and aesthetics

Premium Structure

Steel bar joist rafters with durable rubber roofing

Exterior Finish

Maintenance-free rough-faced 8" block in a two-tone color scheme (light gray and charcoal)

Interior Walls

2x6 steel studs from floor to ceiling, with 5/8" drywall on each side, taped and painted to code

Ceiling Heights

20' at the front and 17' at the rear

Available Options

Second-floor mezzanine with stairs

Car hoist installation

Low voltage wiring for TV and cable

Epoxy floor finishes

Build-to-suit customization

Holly Woods Storage Building B

Doors

Premium
  • 12' x 14' insulated overhead door
  • 3-0' x 7-0' steel insulated grade door

Plumbing

Full
  • Half bath in each unit
  • Slop sink on exterior of bathroom wall
  • Interior hose bib for washing
  • Center floor drain

Electrical

150 Amp
  • Individual 150 amp panel with 220 plug
  • General plugging throughout
  • Emergency lighting
  • LED high bay lights

Climate Control

  • Climate-controlled forced air with A/C unit and ceiling fans
Holly Woods Storage Floor Plan

Development Timeline

Our project is progressing on schedule. Here's what to expect in the coming months.

Construction Phase

Q1-Q2 2025

Foundation work is complete, and structural elements are being installed. Exterior walls and roofing are in progress.

In Progress
65% Complete

Interior Finishing

Q3 2025

Installation of doors, security systems, and climate control units. Electrical and plumbing work will be completed.

Coming Soon

Pre-Leasing Phase

Q3 2025

Reserve your unit before the official opening. Special rates for early adopters and priority selection of premium units.

Starting Q3 2025

Grand Opening

Q4 2025

Official opening of Holly Woods Storage. Join us for the ribbon-cutting ceremony and exclusive tours of the facility.

Q4 2025

Current Progress

Construction is 65% complete and on schedule for Q4 2025 opening

65%
Construction
100%
Planning
50%
Materials
30%
Pre-leasing

Our Units

Explore our premium storage solutions designed for modern businesses.

Buildings 1 & 2

Buildings 1 & 2

Approximately 1437 sq. ft.

Learn More
Buildings 3 & 4

Buildings 3 & 4

Approximately 1465 sq. ft.

Learn More
Holly Woods Storage Overview

Opening in 2025

Join our priority list to be the first to know when units become available.